Direct Purchase from the Developer in the City Center (No Commission): The Complete 2025 Guide

Direct Purchase from the Developer in the City Center (No Commission): The Complete 2025 Guide

Buying directly from the developer in Sofia’s City Center combines financial upside (no intermediary commission) with legal certainty—when the process is structured properly.

At Pirotska Residence, we build on 30 years of experience in residential development and new-build sales, turning the journey from first viewing to occupancy into a transparent, predictable path. This guide is practical, decision-oriented, and designed to help you choose City Center apartments with minimal risk and maximum clarity at each stage.


Prices & Availability (Guide)

Prices from: 1,917 €/sq.m (≈ 3,749.33 BGN/sq.m). This reference point is indicative and depends on floor, aspect, level of finish, storage rooms, and parking options.
Budgeting examples (indicative):

  • Compact one-bed / small two-bed with net area ≈ 65 sq.m≈ 124,605 €.

  • Two-bed with net area ≈ 85 sq.m≈ 162,945 €.

With direct developer communication you get live availability, potential layout tweaks, and bundled options for parking/storage. To avoid missing new units, follow the internal list “Apartments in the City Center.”


Who Benefits Most from Direct Purchase—and What You Gain

Core benefits that directly impact budget and control:

  • No broker commission – typical savings 2–3% of the property price. At 250,000–350,000 €, that’s 5,000–10,500 € you can reinvest in kitchen, appliances, or interior.

  • Direct access to information – construction stages, protocols, specifications, timelines, feasible change orders.

  • Faster decisions – negotiate directly on payment schedules, stage acceptances, parking bays, and fit-out.

  • Traceability – paper trail at every milestone; clearly defined responsibilities; signed protocols.

When a broker still adds value (balance):
If you lack time/experience for negotiations, need to sell your current home in parallel, or face a specific mortgage structure. Direct purchase preserves your choice and control—it doesn’t forbid additional expert input.


Trust Checklist: Comprehensive Developer Verification (30 Years of Experience)

This section consolidates every key verification step into one focused checklist, so you can assess credibility at a glance. Save it—this is the practical tool that protects your time and budget.

Public Sources

  • Business Register – current corporate status, ownership, changes, encumbrances.

  • Building Permit – number, date, validity; any amendments and compliance with the project.

  • National Construction Supervision / Municipality – orders, prescriptions, sanctions, status of filed signals (if any).

Documents Before Signing

  • Building right / Notarial deed for land – clear legal basis for construction.

  • Design package + specification – façade systems, thermal & acoustic insulation, windows, HVAC/heat pump, common areas, lifts.

  • Current construction stage – which Act has been reached (see next section); request stage protocols and a dated timeline.

  • Payment schedule – tied to construction stages and signed protocols; escrow option recommended.

  • Warranty terms – for works, façade, MEP systems, and common areas.

Red Flags

  • Mismatches between promised specs and the contract/project documents.

  • Excessive deposit without clear refund conditions and deadlines.

  • Unclear land status or unrecorded changes to the building permit.

  • Delays/refusals to provide stage protocols and handover documentation.


Act 14, Act 15 & Act 16—Explained Clearly

Understanding these three milestones prevents misunderstandings and lets you schedule payments based on facts, not promises.

Act 14 – Shell & Core

Confirms that the structural frame is complete (slabs, walls, roof). Typically a reference point for an intermediate payment. At this stage, the real geometry of the apartment is visible.

Act 15 – Investor Commissioning

A committee accepts the works from the contractor and issues a protocol listing snags and deadlines for remedy. Ask for written evidence that corrections have been completed before moving to the next payment.

Act 16 – Certificate of Occupancy

The building is officially commissioned and can be used. Best practice: link final payment / title transfer to Act 16 or to a clearly defined deadline with penalties.

Micro-checklist: Building Permit → Act 14Act 15 (snag list + remedies) → Act 16 → formal occupancy.


The No-Commission Buyer Journey—Step by Step

1) Financial planning
Seek pre-approval from 1–2 banks; confirm LTV range, monthly instalment, and lending fees. Budget a 3–5% buffer for municipal tax, notary fees, and land registry.

2) Reservation / deposit
Define amount, validity period, and refund conditions (e.g., bank refusal, seller-caused changes). Ideally, the deposit is tied to a stage/protocol, not vague wording.

3) Preliminary agreement
Fix the price, layout, payment schedule, delay clauses, force majeure, and escrow option. Attach a materials list and any custom changes with clear deadlines.

4) Stage-by-stage checks
Arrange site visits by milestones. Request work protocols, photo documentation, and updated deadlines. Clear points of contact reduce stress and speed up decisions.

5) Apartment acceptance
Prepare a snagging list, set remedy deadlines, and plan a re-inspection. It’s prudent to link a portion of payment to an acceptance free of material snags.

6) Notarisation
Final document review, title deed, and land-registry fee. Prepare post-deal admin (utility accounts, homeowners’ association setup/fees).

7) After-sales care
Clear warranty procedures, a contact for maintenance, and acceptance of common areas. Well-managed common parts protect value and reduce future costs.


Financial Upside & Scenarios (EUR-first)

Commission Savings

  • Price 250,000 €2% = 5,000 €, 3% = 7,500 €.

  • Price 350,000 €2% = 7,000 €, 3% = 10,500 €.

These amounts often cover a built-in kitchen, mid-range appliances, lighting, and initial textiles. In the upper market segment, optimising this line item is a tangible advantage of the “direct from developer” model.

Indicative Area-Based Calculations (baseline 1,917 €/sq.m)

  • 65 sq.m≈ 124,605 €;

  • 85 sq.m≈ 162,945 €.

In BGN (indicative): 3,749.33 BGN/sq.m. Final figures reflect common-area shares, selected parking, level of finish, and any upgrades (extra electrical points, enhanced lighting, wet-room fit-out, etc.).


How Pirotska Residence Answers the Buyer’s Key Questions

  • Prime City-Center location – walkable access to transport, culture, and daily services; superior liquidity on resale.

  • Contemporary new-build – predictable timelines, documented traceability, stage protocols, quality control.

  • Energy & acoustic comfort – integrated thermal and sound insulation, modern HVAC/heat-pump solutions, lower operating costs.

  • Functional floorplans1–3 rooms with smart storage, daylight, and everyday ergonomics (niches, laundry/store).

  • Transparent communication – direct line to the developer, fast feedback, and personalised solutions within project limits.


Frequently Asked Questions

Is the deposit refundable if I withdraw?
Yes—if the contract defines it clearly: validity period, permitted reasons (e.g., bank refusal), and the method/timing of refund. Avoid ambiguous clauses.

When do I sign the preliminary agreement?
After reservation and completed document checks. The agreement must fix price, deadlines, stage payments, and specifications.

Can I change the layout/materials?
Yes, up to a defined stage. Requires written approval; surcharges and revised deadlines may apply.

What do Acts 14/15/16 mean for me as a buyer?
They are milestones—from structure (Act 14), through investor acceptance (Act 15), to occupancy (Act 16). Tie payments and acceptance to them.

Do I need a broker if I buy directly?
Not mandatory. Helpful if you lack time/experience or are selling a property in parallel. Direct purchase gives you control, yet still allows an independent second opinion.


Calls to Action

  1. Download the “Developer Verification Checklist (PDF)” – your main lead magnet, lowest entry barrier, highest perceived value.

  2. Book a viewing – short form with preferred days/hours; weekday and weekend slots.

  3. Subscribe to the monthly construction update – concise photo summaries and act-status notes.


Extra Tips for Viewings & Negotiations

  • Visit at different hours – assess daylight, ambient noise, and traffic morning/evening.

  • Technical specifics – ask about U-values for façade/windows, insulation thickness, acoustic solutions between units and towards the staircase/lift.

  • Common-area maintenance – review the service budget, what it covers (cleaning, lighting, lift, landscaping), and how the HOA is managed.

  • Parking/storage – inspect real parking bays and storerooms; check clear heights, ramps, and turning widths.

  • Contract clauses – fix deadlines, penalties, and stage acceptances; place all custom changes in a signed appendix with exact specs.


Internal Navigation


Final Takeaway:
A direct purchase from the developer is an efficient route to new-build in the City Center when you combine proper verification, stage acceptances via Acts 14/15/16, and a well-drafted contract. With prices from 1,917 €/sq.m (≈ 3,749.33 BGN/sq.m) and a focus on energy performance, acoustic comfort, and functional layouts, Pirotska Residence offers a modern urban experience with a predictable budget and strong long-term liquidity. Your smartest first move is simple: download the checklist, compare availability, and book a viewing on a day that suits you.

Call us Chat With Us